To save and resources for the future generation, of Haryana (Department of Renewal Energy) has started an electricity saving project called as Solar Rooftop Power Plant. Under this scheme, provides Solar System Plant to every Residential, Institutional, Social Sector, Private, and Commercial & Industrial Sector across state.
We all know the advantages of solar and its importance in our still, not everyone is adopting it in the residential/commercial sector and its obvious reason is expensive.
Therefore, Haryana government understood this problem and launched solar subsidy 30% of the benchmark cost for this sector. Besides, 70% subsidy in hill stations states like Himachal Pradesh, Uttarakhand, and Jammu & Kashmir, and 90% subsidy available for farmers on water pumping systems.
The objective of this solar scheme is to promote alternate
Benchmark cost of Grid Connected Solar System as per the Central Government of India, MNRE - Last Updated, January, 2022
System | Govt. Subsidy | Customer Price |
Up to 3kW | 40% | |
Above 3kW to Upto 10kW | 20% | |
Above 10kW | 0% | |
Cost of 3kW Solar System | Without Subsidy | 1,80,000 |
Customer Payable Amount | With Subsidy (- Rs. 72,000) | 1,08,000 |
Cost of 5kW Solar System | Without Subsidy | 3,00,000 |
3kW | 40% Subsidy (3*24,000) | -72,000 |
2kW | 20% Subsidy (2*12,000) | -24,000 |
Customer Payable Amount | With Subsidy (-96,000) | 2,04,000 |
5kW - Generation | Benefits | Units - Rs. 7.5/U |
Daily Genration | 25 Units | 187 |
Monhtly Genration | 625 Units | 4687 |
Yearly Generation | 7,500 Units | 56, 250 |
Lifetime Generation | 1,87,500 Units | 14,06,250 |
Return on Investment | 3.6 years | |
Income | 6.89X | |
Installation Area | ||
1. | Mono Perc | 500 sq.ft. |
2. | Shark 440W - 540W | 300 sq.ft. |
Step-1: Visit Renewable Energy DepartmentHaryana/ Haryana Renewable Energy Development Agency (HAREDA)
Visit: www.hareda.gov.in
Step-2: Sign up link (Create username and password)
Step-3: Click on Apply
What are the documents required to apply for
Soft copy of Identity Proof (Any One):
- PAN Card
- Passport
- Voter Card
-
Aadhaar Card - Driving License
- Identity Card issued by
govt .department - Soft copy of Residence Proof - Electricity Bill
Step-4: Fill up all required details and submit
Step-5: Courier all documents to HARDEA office in Panchkula or your nearest office.
Why should We Install Grid Connect/On Grid solar system?
- Reduce your electricity bill up to 90%.
- Life more than 25 years.
- Payback period about 5 years.
- No maintenance.
- Additional FAR up to 12% allowed.
- Approximately cost Rs. 60,000- Rs.75, 000 per
kWp . - Additional incentive of up to Re.1.00 per unit
on total solar power-generated in electricity bills. - Feed Excess Solar power to
grid through Net-Metering Facility. - Generate approximately 1500 Units of electricity per
kWp annually
Important to know about solar plant installations
- Space Requirement 10 Sq.mt./
kwp - No Application fee
- Installation of solar plant is mandatory in
few categories inbuilding - No permission required from HUDA for installation
-
Subsidy is available ongrid connected system -
Solar panel should be made in India.
Loom Solar, is one of the Delhi NCR based solar company that gives you full details about the solar power system. We provide solar consulting &
What is the entire process?
To apply solar subsidy, you should follow the following steps:
Step 1: Site Survey. Book Engineer Visit from here.
Step 2: System Capacity, Costing & Performance Analysis
Step 3: Buy Solar System & Installation
Step 4: Apply for Net Metering
Step 5: Get Solar Subsidy after 30 days of rooftop solar panel installation