How to Install On Grid Solar System without Net Meter ?

This is Sir Zero Export. Yes, this is zero export. This is what comes with the inverter. This is a zero export device. Zero export is enabled in 3-phase connection. Right now this same zero export is applicable in single phase also. However, the connection which is of inverter and which is inverter which is 3 phase.


Watch Video:- नेट मीटर के बिना भी लगवा सकते है ऑन ग्रिड सोलर सिस्टम

Therefore, it has zero export connection. This is the meter from this zero export. The meter, which is of this customer, runs on the solar system. This is 3-phase meters. Here you will see that 3-phase and 1 is natural. Moreover, what this is a component of the entire solar system. From here, it will go on the grid again.

Leave a comment

ਸਭ ਤੋਂ ਵੱਧ ਵਿਕਣ ਵਾਲੇ ਉਤਪਾਦ

Engineer VisitEngineer Visit
Loom Solar Engineer Visit
Sale priceRs. 1,000 Regular priceRs. 2,000
Reviews
Dealer RegistrationLoom Solar Dealer Registration
Loom Solar Dealer Registration
Sale priceRs. 1,000 Regular priceRs. 5,000
Reviews