3 kw Off-Grid Solar Power Installation in District-Agar malwa,Shajapur, Madhya Pradesh

District-Agar malwa,Shajapur, Madhya Pradesh:  Agar Malwa District became the 51st district of Madhya Pradesh on 16 August 2013. It was carved out of the existing Shajapur District. Its administrative headquarters are situated in the town of Agar.

 There peoples adopting Off-Grid Solar Power with Loom Solar's Mono-crystalline solar Module which is installed on a School roof. The 3 kw  solar panels are all set assure that the electricity produces shall save 84 trees over its lifetime & reduce carbon footprint by 49.8 Tons.

 

 

The acceptance of Loom Solar's Mono-crystalline solar Module has been the testimony to the fact that these modules are sturdy, easy to install, and quick at plug & play mode.This Off-Grid Solar Power installed at  ST. SEBASTIAN'S CONVENT HIGH SCHOOL shall generate 66000 units of electricity in its lifetime.

This Mono-crystalline solar Module has been installed by our our Dealer - Mr. Gangaram Sonti. He is our dealer in Chotiyakhedi, tehsil Shujalpur, Shajapur , Madhya Pradesh.

Solar by gangaram sontiSolar in mpSolar in schoolSolar installation in shajapur

Leave a comment

அதிகம் விற்பனையாகும் பொருட்கள்

பொறியாளர் வருகைபொறியாளர் வருகை
Loom Solar பொறியாளர் வருகை
Sale priceRs. 1,000 Regular priceRs. 2,000
Reviews
டீலர் பதிவுLoom Solar Dealer Registration
Loom Solar டீலர் பதிவு
Sale priceRs. 1,000 Regular priceRs. 5,000
Reviews